Appearance
UpdateScheduleAllocationInput
Type: Input
Input for updating a schedule allocation. Only provided fields are changed.
Fields
| Name | Type | Default | Description |
|---|---|---|---|
| endAt | ISO8601 | New ISO-8601 end timestamp; the result must still be strictly after startAt. Omit to leave unchanged. | |
| isLocked | Boolean | Pin or unpin the allocation against the schedule optimizer. Omit to leave unchanged. | |
| operationId | OperationID | Point the allocation at a different routing operation ("opr_01K…"). Omit to leave unchanged. | |
| plannedOperationId | PlannedOperationID | Point the allocation at a different planned operation ("pop_01K…"). Omit to leave unchanged. | |
| scheduleScenarioId | ScheduleScenarioID | Move the allocation into a different schedule scenario ("sch_01K…"). Omit to leave unchanged. | |
| startAt | ISO8601 | New ISO-8601 start timestamp. Omit to leave unchanged. | |
| workCenterId | WorkCenterID | Re-book the operation onto a different work center ("wcr_01K…"). Omit to leave unchanged. |