Skip to content

PlannedEdgeState ​

Type: Object

A dependency edge between planned operations carrying byproduct info

Fields ​

NameTypeArgsDescriptionDeprecated
createdAtISO8601!ISO-8601 timestamp at which this edge row was written — i.e. the time of the plan write that produced the current edge set.
expectedQuantityIntExpected amount of the intermediate flowing across this edge, in unit. Non-negative; null when the flow is not quantified.
idPlannedEdgeID!TypeID of this planned edge (ped_…). Generated server-side and re-issued whenever the plan's edges are replaced.
intermediateString!The intermediate product handed from predecessor to successor (e.g. printed sheets, folded signatures). Never empty.
predecessorIdPlannedOperationID!TypeID of the upstream planned operation (pop_…) that must finish first.
productionPlanIdProductionPlanID!TypeID of the production plan (ppl_…) this edge belongs to.
sortOrderInt!Ordering position of the edge within its plan. Defaults to the edge's index in the submitted list; presentation only.
successorIdPlannedOperationID!TypeID of the downstream planned operation (pop_…) that consumes the predecessor's output. Never equal to predecessorId; the edge set must form a DAG.
unitStringUnit of measure for expectedQuantity (e.g. sheets, signatures). Null when no quantity is given.
updatedAtISO8601!ISO-8601 timestamp of the last write to this edge.

Connect machines, automate workflows, and build custom apps for print production.