Appearance
PlannedEdgeInput
Type: Input
A dependency between two planned operations of the same upsert, referenced by their positions in the plannedOperations list (server-side ids do not exist yet).
Fields
| Name | Type | Default | Description |
|---|---|---|---|
| expectedQuantity | Int | Expected amount of the intermediate flowing across this edge, in unit. Must be non-negative; omit when the flow is not quantified. | |
| intermediate | String! | The intermediate product passed from predecessor to successor (e.g. printed sheets, folded signatures). Must not be blank. | |
| predecessorIndex | Int! | Zero-based index into the request's plannedOperations list identifying the upstream step. Must be in bounds. | |
| sortOrder | Int | Ordering position within the plan. Defaults to the edge's index in this list when omitted. | |
| successorIndex | Int! | Zero-based index into the request's plannedOperations list identifying the downstream step. Must be in bounds and differ from predecessorIndex; the resulting edge set must form a DAG. | |
| unit | String | Unit of measure for expectedQuantity (e.g. sheets, signatures). |