Skip to content

PlannedEdgeInput ​

Type: Input

A dependency between two planned operations of the same upsert, referenced by their positions in the plannedOperations list (server-side ids do not exist yet).

Fields ​

NameTypeDefaultDescription
expectedQuantityIntExpected amount of the intermediate flowing across this edge, in unit. Must be non-negative; omit when the flow is not quantified.
intermediateString!The intermediate product passed from predecessor to successor (e.g. printed sheets, folded signatures). Must not be blank.
predecessorIndexInt!Zero-based index into the request's plannedOperations list identifying the upstream step. Must be in bounds.
sortOrderIntOrdering position within the plan. Defaults to the edge's index in this list when omitted.
successorIndexInt!Zero-based index into the request's plannedOperations list identifying the downstream step. Must be in bounds and differ from predecessorIndex; the resulting edge set must form a DAG.
unitStringUnit of measure for expectedQuantity (e.g. sheets, signatures).

Connect machines, automate workflows, and build custom apps for print production.