Appearance
PlannedOperationInput
Type: Input
One planned production step in a plan upsert/create. Positional: an edge refers to a step by its index in the plannedOperations list.
Fields
| Name | Type | Default | Description |
|---|---|---|---|
| capabilityId | CapabilityID! | TypeID of the capability (cpb_…) the work centre running this step must possess. Pins the step to a class of resources. | |
| concreteKind | OperationKind! | Concrete kind of work performed, from the vertical's operation-kind catalog (e.g. printing, folding, binding). | |
| estimatedDurationMinutes | Int! | Estimated run time in minutes, excluding setup. Must be non-negative. | |
| name | String! | Human-readable name of the step. Must not be blank. | |
| operationId | OperationID! | TypeID of the job operation (opr_…) this step realises. Rejected if it does not belong to the plan's job. | |
| productionQuantity | Int | Units this step is planned to produce. Omit when the step's quantity is not planned; must be non-negative. | |
| setupDurationMinutes | Int | Make-ready time in minutes before the run. Defaults to 0 when omitted. | |
| sortOrder | Int | Ordering position within the plan. Defaults to the operation's index in this list when omitted. |