Skip to content

PlannedOperationInput ​

Type: Input

One planned production step in a plan upsert/create. Positional: an edge refers to a step by its index in the plannedOperations list.

Fields ​

NameTypeDefaultDescription
capabilityIdCapabilityID!TypeID of the capability (cpb_…) the work centre running this step must possess. Pins the step to a class of resources.
concreteKindOperationKind!Concrete kind of work performed, from the vertical's operation-kind catalog (e.g. printing, folding, binding).
estimatedDurationMinutesInt!Estimated run time in minutes, excluding setup. Must be non-negative.
nameString!Human-readable name of the step. Must not be blank.
operationIdOperationID!TypeID of the job operation (opr_…) this step realises. Rejected if it does not belong to the plan's job.
productionQuantityIntUnits this step is planned to produce. Omit when the step's quantity is not planned; must be non-negative.
setupDurationMinutesIntMake-ready time in minutes before the run. Defaults to 0 when omitted.
sortOrderIntOrdering position within the plan. Defaults to the operation's index in this list when omitted.

Connect machines, automate workflows, and build custom apps for print production.