Skip to content

PrintOperationPhaseDurations

Type: Object

A structured bundle of setup, production, and cleanup durations for a print operation. This embedded resource captures phase-level timing used for estimating, scheduling, and shop-floor analysis. Validations ensure at least one phase is provided, and calculations support totals and comparisons—grounding commercial estimates in real operational timings.

Fields

NameTypeArgsDescriptionDeprecated
cleanupDurationDuration for cleanup phase
productionDurationDuration for production phase
setupDurationDuration for setup phase

Relationships

Connect. Combine. Collaborate.
The pioneering open integration platform, dedicated to transforming connectivity in the printing industry.