← All types
ProductionOb Object

SimulationCoverage

How honest the twin was: compares predicted end windows with what actually happened, recomputed periodically

Fields

Real allocations whose operation has since completed

Of those, how many completed inside the predicted P10–P90 window

insideP10P90 over evaluatedAllocations; null when nothing was evaluable

Mean of actual minus predicted median end, in minutes; positive = reality ran later. Null when nothing was evaluable

When coverage was last recomputed (ISO8601)

Referenced by (1)
Exact type SDL
"""
How honest the twin was: compares predicted end windows with what actually happened, recomputed periodically
"""
type SimulationCoverage {
  """Real allocations whose operation has since completed"""
  evaluatedAllocations: Int!
  """Of those, how many completed inside the predicted P10–P90 window"""
  insideP10P90: Int!
  """
  insideP10P90 over evaluatedAllocations; null when nothing was evaluable
  """
  insideRatio: Float
  """
  Mean of actual minus predicted median end, in minutes; positive = reality ran later. Null when nothing was evaluable
  """
  meanSignedErrorMinutes: Float
  """When coverage was last recomputed (ISO8601)"""
  evaluatedAt: ISO8601!
}