MetricProjectionResult
Linear regression and forward projection of a metric
Fields
The metric that was analyzed
Slope of the linear regression (units per second)
Y-intercept of the linear regression
R-squared goodness of fit (0.0-1.0, higher is better)
Number of data points used for the regression
Projected future values at regular intervals
Estimated time when the target value will be reached (ISO8601), if the trend permits
Referenced by (1)
Exact type SDL
"""Linear regression and forward projection of a metric"""
type MetricProjectionResult {
"""The metric that was analyzed"""
metricId: MetricID!
"""Slope of the linear regression (units per second)"""
slope: Float!
"""Y-intercept of the linear regression"""
intercept: Float!
"""R-squared goodness of fit (0.0-1.0, higher is better)"""
rSquared: Float!
"""Number of data points used for the regression"""
sampleCount: Int!
"""Projected future values at regular intervals"""
projections: [ProjectedPoint!]!
"""
Estimated time when the target value will be reached (ISO8601), if the trend permits
"""
targetReachesAt: String
}