← All types
Ob Object

CalculatedOperationDuration

Separate calculated phase durations and provenance. Run production quantity includes waste once. Cleanup is informational and not priced as setup/run. ML predictions use an independent phase-compatible basis and never replace calculated pricing.

Fields

Zero-based index of the operation in the inferred production DAG.

Authoritative setup phase duration in seconds; null when this phase was not calculated.

Authoritative production run duration in seconds, including the calculation's single waste allowance.

Origin of setup time, such as explicit seconds, capability setup minutes or the work center default.

Origin of run time, distinguishing explicit seconds from physical demand divided by throughput.

Selected eligible machine or work center whose timing profile justified the calculation; absent for unbound explicit times.

Selected production capability used to resolve a compatible throughput and setup profile.

Gross physical machine demand after waste and applicable sheet rounding; distinct from finished-copy quantity.

Physical unit of gross machine demand, such as sheets, impressions or metres.

Possible values (15)
CLICK

A billing counter rather than a physical measure: one metered page charged under a cost-per-click press or copier contract.

CM

Centimetres — metric length, a hundredth of a metre.

FT

Feet — imperial length, twelve inches.

G

Grams — metric mass, for light items stocked by weight.

IMPRESSION

A production counter rather than a physical measure: one pass of one sheet through a press. Distinct from SHEET, since a sheet printed on both sides can cost two impressions.

IN

Inches — imperial length, the unit paper sizes are quoted in outside metric markets.

KG

Kilograms — metric mass, the usual unit for reel and other bulk substrate stock.

LB

Pounds — imperial mass, roughly 0.45 kg.

M

Metres — metric length, the usual unit for material bought by the running metre such as a reel or a roll of laminate.

MM

Millimetres — metric length, a thousandth of a metre, and the granularity trim sizes and other sheet dimensions are normally given in.

OZ

Ounces — imperial mass, a sixteenth of a pound.

PC

Pieces: a plain count of discrete items, carrying no dimension at all. The unit stock and transfer quantities fall back to when none is given.

PT

Points — the typographic length unit of one seventy-second of an inch, used for type sizes and rule weights rather than for stock quantities.

REPEAT

One printed repeat of a web: a cut-off in web offset, a repeat in flexo and labels. What a roll press counts when it produces signatures.

SHEET

A count of substrate sheets, the usual unit for sheet-fed stock. Counts the physical sheets held or moved, not the press passes over them (see IMPRESSION).

Configured throughput before efficiency adjustment; its unit and time period are identified by rateProfile.

Capability throughput key or default processing-rate source that identifies how nominalRate was interpreted.

Positive work center multiplier applied to nominal throughput when calculating run time.

Accumulated production demand multiplier; applied once to calculated demand and never again to explicit phase seconds.

Separate configured cleanup time in seconds, retained for scheduling provenance and excluded from setup/run quote costing.

Referenced by (1)
Exact type SDL
"""
Separate calculated phase durations and provenance. Run production quantity includes waste once. Cleanup is informational and not priced as setup/run. ML predictions use an independent phase-compatible basis and never replace calculated pricing.
"""
type CalculatedOperationDuration {
  """Zero-based index of the operation in the inferred production DAG."""
  operationIndex: Int!
  """
  Authoritative setup phase duration in seconds; null when this phase was not calculated.
  """
  setupSeconds: Float
  """
  Authoritative production run duration in seconds, including the calculation's single waste allowance.
  """
  runSeconds: Float
  """
  Origin of setup time, such as explicit seconds, capability setup minutes or the work center default.
  """
  setupSource: String
  """
  Origin of run time, distinguishing explicit seconds from physical demand divided by throughput.
  """
  runSource: String
  """
  Selected eligible machine or work center whose timing profile justified the calculation; absent for unbound explicit times.
  """
  workCenterId: WorkCenterID
  """
  Selected production capability used to resolve a compatible throughput and setup profile.
  """
  capabilityId: CapabilityID
  """
  Gross physical machine demand after waste and applicable sheet rounding; distinct from finished-copy quantity.
  """
  productionQuantity: Float
  """
  Physical unit of gross machine demand, such as sheets, impressions or metres.
  """
  productionUnit: MeasurementUnit
  """
  Configured throughput before efficiency adjustment; its unit and time period are identified by rateProfile.
  """
  nominalRate: Float
  """
  Capability throughput key or default processing-rate source that identifies how nominalRate was interpreted.
  """
  rateProfile: String
  """
  Positive work center multiplier applied to nominal throughput when calculating run time.
  """
  efficiencyFactor: Float
  """
  Accumulated production demand multiplier; applied once to calculated demand and never again to explicit phase seconds.
  """
  wasteFactor: Float!
  """
  Separate configured cleanup time in seconds, retained for scheduling provenance and excluded from setup/run quote costing.
  """
  cleanupSeconds: Float
}